Peel Plastics Ink Room Complex Alteration

CSL has been engaged as the general contractor for the Peel Plastics Ink Room Complex project, which involves constructing a two-storey mezzanine within the company’s existing facility. The scope includes significant foundation modifications, the assembly of the mezzanine using CMU, insulated metal panels (IMP), structural steel, and metal decking. Additionally, the project features an interior stair shaft, an exterior emergency exit staircase extending from the ground floor to the roof, and structural upgrades to support a new make-up air (MUA) unit

Location

Brampton,  ON

Owner

Peel Plastic Products

Consultant

Tacoma Engineers

Construction Services

General Contracting