University of Waterloo Brine Tank Replacement

This project involved the removal of two (2) cast-in-place concrete underground brine tanks and replacement with fill, removal and replacement of sections of the damaged basement foundation walls at the Central Services Building and installation of two (2) aboveground fiberglass reinforced plastic brine tanks. The scope of work also includes the replacement of the asphalt loading ramp, and includes modifications and removals of plumbing, piping, conduits, pumps and other miscellaneous systems. The contract includes all required civil, structural, mechanical, electrical and shoring for completion of fully operational system

 

Location

Waterloo, ON

Owner

University of Waterloo

Consultant

Stantec Consulting Ltd

Construction Services

General Contracting